What a Site Appraisal Should Check Before You Buy a Plot

Buying a building plot is exciting, and it is easy to fall for a view before checking the paperwork. But a plot without a reliable planning position is just a field, and the price should reflect that. A planning appraisal before you buy is one of the best investments you can make.

This checklist sets out what a good appraisal should cover for a plot in Northern Ireland. It does not replace your solicitor’s searches or a surveyor’s report. It sits alongside them and answers a different question: what can actually be built here?

1. Is there a planning permission, and is it live?

Many plots are sold “with planning”. The first job is to find out exactly what that means.

  • What type? Outline permission establishes the principle; full permission approves the detail. See outline or full planning permission.
  • When does it expire? For outline permission, reserved matters must normally be applied for within three years. For full permission, work must normally start within five years. Check the decision notice, because conditions can change these periods.
  • Has it been implemented? If the seller says work has started to keep the permission alive, ask for evidence and check that pre-commencement conditions were discharged first. Work carried out in breach of a pre-commencement condition may not count.
  • Who was the applicant? Planning permission normally runs with the land, but some permissions carry personal or occupancy conditions.

If the permission is close to expiring, a new application will be judged against current policy, which may be stricter than when the original was granted.

2. What do the conditions require?

Read every condition. Look for:

  • siting, ridge height, floor area or storey limits that restrict the house you can build;
  • landscaping and boundary planting requirements, including keeping existing hedges;
  • access and visibility splay requirements;
  • drainage requirements, such as a particular treatment system;
  • occupancy restrictions, for example on some farm or business-related dwellings;
  • demolition or restricted-use conditions on replacement dwellings.

Our article on planning conditions explains why some must be met before any work starts.

3. Can the access be built?

This is the most common hidden problem with rural plots. Check that the visibility splays shown on the approved drawings are within the land being sold, or that there is a legal agreement over a neighbour’s land. Check that the splays can actually be achieved on the ground. See site access and DfI Roads.

4. Drainage and services

Where there is no mains sewer, the plot needs space for a septic tank or treatment plant and a soakaway that works on the ground conditions. Discharge consent from the environmental regulator may be needed. Check water supply, electricity and, where relevant, the cost of bringing services to the site.

5. If there is no permission: what is the policy position?

For a plot without permission, the appraisal needs to look at the principle:

  • Is the land inside a settlement limit, or in the countryside?
  • If it is countryside, which policy route could apply: infill in a built-up frontage, a cluster, a replacement building, a farm dwelling? Our countryside homes page explains them.
  • Which plan does the council use, a Plan Strategy or the older Planning Policy Statements? See which plan applies to my site.
  • Is a farm dwelling route dependent on the seller’s farm business, and has the farm already had a dwelling approved or sold off a site in the last ten years?

6. Planning history of the site and neighbours

Refusals on the same land or nearby are a warning sign. Appeal decisions are even more telling. Recent approvals nearby can help, but only if the circumstances are genuinely comparable.

7. Constraints and designations

  • Flood risk, from rivers, the sea or surface water.
  • Areas of outstanding natural beauty and other landscape designations.
  • Listed buildings and conservation areas nearby.
  • Archaeological sites.
  • Protected trees and hedges.
  • Ecology, including the likelihood of bats in old buildings to be demolished.
  • Overhead lines, pipelines and other infrastructure.

8. Is the price right?

Once the planning position is clear, you can judge whether the asking price reflects it. A plot with full permission, a deliverable access and simple drainage is worth more than one with outline permission close to expiry and an access over someone else’s hedge. An appraisal gives you evidence for negotiation, or a reason to walk away.

Timing the appraisal

Ideally, before an offer is agreed. At the latest, before contracts are signed, and make your offer subject to a satisfactory planning position if you can. Planning checks take time when old files need to be read, so do not leave it to the last week.

How we help

Our site appraisal service covers each of the points above and gives you a written view on what can be built and the main risks. If you would like a quick view first, our free initial view is a good place to start.

Ask us first: the first conversation is free

Tell us the address or postcode and what you have in mind. We will say whether you are likely to need permission and what the sensible next step is. Ring 028 9591 6888 or email info@niplanningpermission.co.uk.

Call now028 9591 6888 Emailinfo@ Free advicecontact form