Planning Permission and Building Control: Two Separate Processes

"We have planning, so we are good to go." It is one of the most common misunderstandings we hear. Planning permission and building regulations approval are separate systems, and one does not imply the other.

Two different questions

Planning asks whether a development is acceptable in that place: its use, its size and appearance, its effect on neighbours and the area, and whether it meets the development plan. It is run by the council’s planning service under the Planning Act (Northern Ireland) 2011.

Building control asks whether the building is built properly: structure, fire safety, insulation and energy use, ventilation, drainage, access and safety. It is run by the council’s building control service under the Building Regulations (Northern Ireland) 2012.

The two teams sit in the same council, but they are separate services, with separate applications and fees.

Which projects need which

  • Both: most new houses, larger extensions and many changes of use, such as converting a house into flats.
  • Building regulations only: many internal alterations, such as removing a load-bearing wall, a loft conversion within permitted development limits, or a new bathroom with new drainage.
  • Planning only: some changes of use with no building work, certain fences and walls, and some outbuildings below building regulations thresholds.
  • Neither: like-for-like repairs and minor works.

The dividing lines can be surprising. A rear extension that is permitted development under planning still normally needs building regulations approval.

Timing and order

There is no rule that you must have planning permission before applying for building regulations approval, but in practice it is sensible to get planning first, because planning may change the design. Building control drawings are much more detailed than planning drawings, so preparing them before the planning design is settled can mean paying twice.

The paperwork at the end

When building work is complete, building control issues a completion certificate if satisfied. Planning does not issue an equivalent certificate for completed works. Instead, the evidence of planning compliance is the permission, the approved drawings and the letters confirming that pre-commencement conditions were discharged.

When you sell, a buyer’s solicitor will usually ask for both: the planning permission (or evidence that permission was not needed) and the building control completion certificate.

Who signs off what

It helps to think about who is checking your project at each stage. The planning case officer looks at the proposal before permission is granted and, through the conditions, at certain details afterwards. A building control surveyor checks the technical drawings and then inspects the work at key stages on site, such as foundations, drainage and completion. Neither is responsible for the other’s approval. If you use a builder or a design technician, agree at the start who will apply for each consent and who will book the inspections, so nothing falls between the gaps.

Common pitfalls

  1. Assuming building control approval covers planning. It does not. A building inspector checking the foundations is not checking that you have planning permission.
  2. Building control drawings that differ from the planning drawings. If the approved planning design is changed during technical design, for example by moving a window or raising a roof, the change may need planning approval. See after a planning decision.
  3. Forgetting pre-commencement planning conditions because building control is in place. See planning conditions and discharging them.
  4. Starting under a building notice without checking planning. Some routes in building control allow work to start quickly. That speed is no help if planning permission was needed.

Other consents that often get confused

  • Listed building consent for works to a listed building, separate from both planning and building control. See our guide to listed buildings and conservation areas.
  • Conservation area consent for demolition in a conservation area.
  • Advertisement consent for many signs.
  • An HMO licence from the council, which is separate from planning permission for an HMO.
  • Consent from DfI Roads for works affecting a public road.
  • Landlord, lender or management company consent, and any restrictions in your title deeds.

Putting it right later

If you have finished work without building regulations approval, council building control can in some cases deal with it through a regularisation process. If planning permission was needed and not obtained, see retrospective applications and certificates. The two processes are separate, so you may need both.

How we help

We deal with the planning side. We will tell you whether your project needs planning permission, and we coordinate with whoever is preparing the building regulations drawings so the two sets of drawings stay consistent. If you are not sure where to start, see do I need planning permission.

Ask us first: the first conversation is free

Tell us the address or postcode and what you have in mind. We will say whether you are likely to need permission and what the sensible next step is. Ring 028 9591 6888 or email info@niplanningpermission.co.uk.

Call now028 9591 6888 Emailinfo@ Free advicecontact form