If permission was granted
Read every condition
Conditions are part of the permission. Some are simple, such as matching materials. Others must be dealt with before work starts: approving a landscaping plan, agreeing sample materials, or providing a visibility splay at the entrance. Starting work without meeting a pre-commencement condition can leave the whole development unauthorised. Our article on planning conditions and discharging them explains how to clear them.
Note the time limit
A full permission must normally be begun within five years. If the permission is close to lapsing and you are not ready, talk to us about the options early. A fresh application may be judged against newer policy.
Check the other consents
Building regulations approval, listed building consent and any road works licences are separate. The planning and building control article sets out the difference.
Changes during construction
If the design changes after approval, even slightly, check with the council or with us before building it. A change that alters the appearance, size or position of the building may need a new application. Building something different from the approved drawings is a common source of enforcement complaints.
If permission was refused
Read the reasons carefully
Each refusal reason points to a policy the council says the proposal does not meet. Some reasons are about the principle (the site does not fit any rural housing policy, for example). Others are about detail, such as design, overlooking or access. The second kind can often be overcome.
Your main options
- A revised application that addresses the reasons. This is often the quickest and cheapest route when the problem is design, siting or missing information.
- An appeal to the Planning Appeals Commission. Appeals are made in writing within a strict time limit, which is generally four months from the date of the decision notice. Appeals take time, and the Commission considers the case afresh.
- Rethinking the scheme, for example a smaller extension within permitted development, or a different policy route for a rural site.
We always start with whether a better first or second application can succeed, because an appeal is not always the best use of time or money.
If you are still waiting
If the council has not decided within the time you expected, find out why. Often a consultee has not replied, or the case officer needs more information. Our guide to replying when the council asks for more information can help you keep the application moving.
If you objected and permission was granted
Third parties in Northern Ireland do not have a right of appeal to the Planning Appeals Commission against a grant of permission. A legal challenge by judicial review is possible only on narrow legal grounds and within a strict time limit, so take legal advice quickly.
Ask us first: the first conversation is free
Tell us the address or postcode and what you have in mind. We will say whether you are likely to need permission and what the sensible next step is. Ring 028 9591 6888 or email info@niplanningpermission.co.uk.