The key points
- SPPS Edition 2 was published on 11 December 2025 and replaced the 2015 edition from that date.
- The focused review covered renewable and low carbon energy. The Department says the other policy provisions are unchanged, apart from technical updates such as paragraph numbering.
- Planning Policy Statement 18 (Renewable Energy) was cancelled from 11 December 2025. Applications and appeals should no longer rely on it in any council area.
What it means for applicants
Renewable energy proposals, such as solar arrays, wind turbines and anaerobic digestion plants, are now assessed against the renewable energy policy in SPPS Edition 2 and, in council areas with an adopted Plan Strategy, the council’s own policies. Supporting statements, objections and consultant reports should refer to the current policy, not PPS 18.
Because Edition 2 renumbered some paragraphs, references to paragraph numbers in the 2015 edition may no longer be correct. Check the current document before quoting it.
Other policies are unchanged
For most of the questions we deal with, such as house extensions, rural dwellings and change of use, Edition 2 makes no practical difference. The other retained Planning Policy Statements, including PPS 21 and PPS 7, continue to apply in the five council areas without an adopted Plan Strategy. See which plan applies to my site.
Sources: Department for Infrastructure, SPPS Edition 2 and Planning Policy.
Ask us first: the first conversation is free
Tell us the address or postcode and what you have in mind. We will say whether you are likely to need permission and what the sensible next step is. Ring 028 9591 6888 or email info@niplanningpermission.co.uk.