Where the rules come from
The rules are in The Planning (General Permitted Development) Order (Northern Ireland) 2015. It is split into Parts and Classes. Part 1 covers houses: Class A for extensions and alterations, Class B for roof additions, Class C for porches, Class D for outbuildings and pools, Class E for hard surfaces, and further classes for things such as oil tanks, flues and antennas. Other Parts deal with farms, industry, shops and utilities.
Northern Ireland has its own Order. The English rules, and terms such as “prior approval” for larger home extensions, do not apply here. Advice written for England can be misleading.
The house extension limits, in plain terms
These are the main limits in Class A for an extension to a house. They are not the full text, and every condition must be checked against the Order itself.
- Buildings added since the house was built, including sheds and garages, must not cover more than half of the garden and grounds (excluding the original house).
- Nothing can be higher than the existing roof, and the eaves cannot be higher than the existing eaves.
- No extension beyond a wall that faces a road and forms the front or side of the original house.
- Single-storey rear extensions: no more than 4 metres deep for a detached house or 3 metres for any other house, no higher than 4 metres, and not within 3.5 metres of a boundary with a road opposite the rear wall.
- Extensions of more than one storey: no more than 3 metres beyond the rear wall, and not within 7 metres of the boundary opposite the rear wall.
- Within 2 metres of any boundary, the eaves of the new part cannot be higher than 3 metres.
- Side extensions: no higher than 4 metres and no wider than half the width of the original house.
- Class A does not cover roof alterations, balconies or raised decks, basements, chimneys or flues, or antennas. Those have their own rules or need an application.
- Materials must look similar to the existing house, and side-facing upper windows within 15 metres of a neighbouring house’s boundary must be obscure glazed and largely non-opening.
Where the rights are narrower or missing
- Conservation areas, areas of outstanding natural beauty and World Heritage Sites: no cladding, no extension of more than one storey or over 4 metres high, and nothing beyond the front or side walls. Roof additions under Class B are not permitted in a conservation area.
- Listed buildings: works within the curtilage of a listed building generally need listed building consent before any permitted development right can apply.
- Flats and maisonettes: the Part 1 householder rights apply to dwellinghouses, not flats.
- Conditions and directions: an earlier planning permission may have removed permitted development rights by condition, and a direction under Article 4 of the Order can withdraw them in a defined area. Check the planning history before relying on the rules.
“Original house” means as first built
Many limits are measured from the original dwellinghouse, meaning the house as it was first built (or as it stood on 1 October 1973 if older). Earlier extensions count against the allowance, even if a previous owner built them.
Getting certainty
If a project sits close to a limit, or you want proof for a future buyer, apply for a certificate of lawfulness of proposed use or development. It is a formal decision that the works would be lawful. It costs less than a full application and avoids arguments later. For the full picture of when an application is needed, see do I need planning permission.
Ask us first: the first conversation is free
Tell us the address or postcode and what you have in mind. We will say whether you are likely to need permission and what the sensible next step is. Ring 028 9591 6888 or email info@niplanningpermission.co.uk.