Do I Need Planning Permission, Building Control Approval, or Both?

Planning permission and building control approval are two separate systems in Northern Ireland, run by different teams in your council. One asks whether a development is acceptable in that place; the other asks whether it is built safely. Many projects need both.

What planning covers

Planning control, under the Planning Act (Northern Ireland) 2011, deals with the use of land and the appearance and impact of buildings: size, position, design, effect on neighbours, roads, landscape and heritage. Permitted development rights mean some work needs no application at all.

What building control covers

Building control applies the Building Regulations (Northern Ireland), which set standards for structure, fire safety, insulation and energy use, ventilation, drainage, access and more. Building control has its own exemptions, which are not the same as planning’s permitted development rights: work covered by the regulations needs approval whether or not planning permission is required.

Common projects

  • Single-storey rear extension within permitted development: no planning application, but building control approval is needed.
  • Loft conversion with a rear dormer within Class B: no planning application, but building control approval is needed for the structure, stairs and fire escape.
  • Removing an internal load-bearing wall: not development, so no planning permission; building control approval is needed.
  • Two-storey side extension: usually both.
  • A garden fence up to 2 metres high, away from a road: usually neither.
  • Change of use from a shop to a flat: usually both.
  • Small garden building: may need neither, one or both, depending on its size, use and position. Ask building control if anyone will sleep in it or if it has plumbing.

How to apply for building control

Building control applications go to your council’s building control service, not through the planning portal. Depending on the work, you either submit full plans for approval before you start, or give a building notice and have the work inspected as it goes. Inspections happen at set stages, and a completion certificate is issued at the end. Keep it with your property papers, because a buyer’s solicitor will ask for it.

Order of play

You can apply for both at once, but it often makes sense to get planning permission first, because the design can change during the planning process. Do not start work until you have every approval you need.

Listed buildings and other consents

Listed building consent is a third, separate consent for works affecting a listed building. Works to protected trees, and some works on roads and footways, need their own permissions too.

Quick answers

Is building control the same as planning permission?

No. Planning permission decides whether a development is acceptable in that location; building control checks that it meets the Building Regulations for structure, fire safety, energy and other standards. They are separate approvals from separate council teams.

If my extension is permitted development, do I still need building control?

Yes. Permitted development only removes the need for planning permission. Building regulations still apply.

Do I need building control for a garden room?

It depends on the building’s size, use, distance from boundaries and whether anyone sleeps in it. Some small detached buildings are exempt, so check with your council’s building control service.